GEMS - Microsoft Campus WCTI Applications (Redmond - Bellevue - Eastgate)

 

Color Coded Key-     As of Sept 29th 2010

  On Line starting up on WCTI Conditions / Water conservation
  Installed - good pressure but needs electrical connection moved
  Pressure booster pumps required to get on line
  40% complete install waiting on booster pump
  Installed - waiting on tech training
  Not installed yet
  Existing older systems & New Construction
   
RedWest Pebble Beach B11A B18 B33 B34
B86 B41 (Troon) B88 B98 B99 B25N
 

B26N B26S B37 CCP Augusta B10CP

B25S

B27

B116

B117

B118

B119

Not on Original Contract

 

   

Bravern #1

Bravern #2

 

Advanta C

   